BROC for Architects & General Contractors
CSI Division 10, 11, and 12 specialty scopes for K–12 schools, colleges, universities, and recreation facilities. Manufacturer-authorized, prevailing wage experienced, ADA-compliance certified.
Specialty Scopes BROC Bids
Division 10 — Specialties
10 51 13 Metal Lockers
10 51 16 Wood Lockers
10 51 26 Plastic-Laminate Lockers
10 51 29 HDPE Lockers
10 14 00 Signage (athletic facility)
Division 11 — Equipment
11 66 13 Exterior Scoreboards
11 66 23 Gymnasium Equipment
11 66 33 Athletic Floor Covers
11 66 43 Basketball Backstops
11 66 53 Gym Divider Curtains
11 66 63 Wall Padding
Division 12 — Furnishings
12 63 13 Telescoping Stands
12 63 16 Telescoping Bleachers
12 66 13 Fixed Audience Seating
12 66 23 Stadium & Grandstand Seating
Note: Gym flooring (Division 09 — Finishes; Sections 09 64 66 Wood Athletic Flooring and 09 65 66 Resilient Athletic Flooring) is included in BROC’s Colorado scope as a separate trade item. Gym floor installation services →
Why GCs and Architects Work with BROC
- Manufacturer-authorized installer — Hussey Seating, Interkal, Porter Athletic, Connor Sports, Robbins, and other major athletic equipment manufacturers
- Prevailing wage experienced — fluent with Colorado prevailing wage and California DSA-compliant public-school project workflows
- ADA compliance certified — documented experience with ICC, ASTM F2151, and federal ADA requirements for athletic facility installations
- Insurance & bonding — General liability, workers\’ comp, commercial auto, bonded for larger projects
- Single-source coordination — multi-trade specialty scopes coordinated under one sub, reducing GC management overhead
- Schedule reliability — submittals delivered on schedule, install crews show up when promised
- Closeout support — manufacturer warranties documented, O&M manuals delivered, training provided to district staff
- Post-occupancy service — same team that installs is available for ongoing service, eliminating the typical year-2 service vendor scramble
Specifier Resources
BROC Capability Statement
One-page overview of BROC’s services, divisions covered, key projects, and credentials. Sized for sub-bid packet inclusion.
Locker Installation Spec Sheet
Manufacturer-neutral reference for specifying school athletic and PE lockers — material comparison, configuration options, ADA quick-reference, installation considerations.
School Gym Renovation Budget Worksheet
Cost ranges and a working budget worksheet across bleachers, gym floors, lockers, and athletic equipment.
Annual Bleacher Inspection Checklist
Working checklist covering structural, mechanical, ADA, and safety items for school bleacher inspections.
Recent BROC Projects
- Fort Carson Trojan Arena — Fountain, CO. Bleachers, arena seating, gymnasium equipment package.
- Arvada High School auxiliary gym — JeffCo Public Schools. Hardwood maple gym floor with custom graphics.
- Westlake Middle School — Gymnasium floor with intricate custom court graphics.
- Newton Middle School — Track-graphic gymnasium floor for multi-use PE programming.
- Multicolor telescoping bleachers — High school gymnasium with custom-color seat decking.
Add BROC to Your Sub-Bid List
Email Randy at randy@brocllc.com or use the contact form. We respond to sub-bid invitations within 2 business days.
